Changefulness’s Weblog

July 3, 2008 · Leave a Comment

7 Hours Freeman House. I completed the color match of the window curtain brackets. I embedded the hanging hardware into the brackets. I changed the front of the curtain cleat so the screws would be concealed. At the house I installed the Curtains in MDS’ office bathroom. MDS decided that we would have the lining in the curtains removed to reduce the volume of the overall look of the curtains. I also installed the curtain cleat in MDS office. I finished installing the electrical panel covers in the basement.

I had a meeting with Jesse about everything that needs to be done in the upstairs guest bathroom:

  • Need a longer pipe to extend the shower head above the top of the curtain frame
  • What’s the deal with the exposed threads?
  • Take wand to George’s to get something that connects to the main pipe.
  • Ask Dad about Nickel plated screws that need to be added to the ceiling mounted hardware
  • Put cover plates on the toilet that match the rest of the cover plates

Categories: Uncategorized

0 responses so far ↓

  • There are no comments yet...Kick things off by filling out the form below.

Leave a Comment