7 Hours Freeman House. I completed the color match of the window curtain brackets. I embedded the hanging hardware into the brackets. I changed the front of the curtain cleat so the screws would be concealed. At the house I installed the Curtains in MDS’ office bathroom. MDS decided that we would have the lining in the curtains removed to reduce the volume of the overall look of the curtains. I also installed the curtain cleat in MDS office. I finished installing the electrical panel covers in the basement.
I had a meeting with Jesse about everything that needs to be done in the upstairs guest bathroom:
- Need a longer pipe to extend the shower head above the top of the curtain frame
- What’s the deal with the exposed threads?
- Take wand to George’s to get something that connects to the main pipe.
- Ask Dad about Nickel plated screws that need to be added to the ceiling mounted hardware
- Put cover plates on the toilet that match the rest of the cover plates